Day 49/50 (Mon/Tue) - Finishing up for rough inspection
Mon/Tue - The plumber brought extra help and got a lot done with the rough plumbing so he would be ready for inspection on Wed.
The carpenter came and roughed in the fireplace, then we realized we made an error and he had to redo part of it. Oops. This picture is before the redo.
The HVAC guy came and put the fireplace in it's framed spot.
Project: Second Story Addition
Rooms: Master Bedroom, Sitting Area, Laundry Room, Walk-In Closet, Master Bath.
Planning Phase: Oct 08 - July 09
Construction Started: August 11 09
Construction Ended: Dec 18, 2009, although it really never ends....