Well, looks as though I haven't had much time to update the blog site so let me bring everyone up to date.
Drywall - Well, that is hard to say complete. I battled with the drwall gang several times to get them to fix little dings and knicks and marks in the plaster. I did the whole upstairs and thought it was fair for them to return to finish the downstairs area. I then found more to do downstairs after they left. Will this drywall mess ever end?????? Meanwhile there is drywall dust on absolutely everything in the house, including the basement.
Exterior - 90% complete. Deck remains and some small tweaks. We did pick up the decking material since they just arrived.
Interior Plumbing - The shower lines have been run and the bathtub is installed in its final spot.
Painting - 2 Coats of paint are everywhere except the hallway and stairway, waiting a little longer for more contractors to finish. I had help painting 1 day and the rest I took a week of vacation and have been working my way around the rooms. I am a bit sick of painting now.
Tile - The laundry room got tiled late this week and he is starting on the bathroom floor in the morning. Nice to see some finishing happening.
HVAC - The furnace and A/C units are mostly installed, waiting for the gas line to be run to finish them up.
Lighting - The lights finally arrive and I picked them up today, wow that took almost as long as the entire project to get those babies.
Friday, October 30, 2009
Thursday, October 15, 2009
Day 64/65 (Wed/Thu) - Taping and Color Selection
Wednesday the drywall taping guys arrived and applied a first coat of mud to everything and taped all the seams. I am dreading the next phase, sanding. Ugh there is going to be a layer of dust everywhere. We just have to keep telling ourselves just wait until it is finished and we'll love it.
We also went to Home Depot and picked out the Deck material and placed it on order. We have decided to try that new composite deck material. We figured it was a small enough area to try it out and see if we like it before we do a big deck in it down the road.
Thursday I met with the fireplace surround/cabinet guy, and we ironed out all the details for the building of the fireplace. Another 50% deposit out the window. He is the same guy who did our current fireplace and bar cabinets so we know he does good work so we felt better about using him versus another new person.
Nobody else showed up today to work on the project, another rain day in paradise.
We have also been experimenting with color options. I think we have selected the ones we are going with but we keep looking at the color wall and rethinking ourselves. Any opinions? If you double click on the photo you will be able to see a larger view of the picture.
Day 63 - Siding
Day 62 (Mon, Oct 12) - Drywall
Today was a very eventful day. DRYWALL DAY.

The carpenter was here to quickly install the pocket doors so they were ready for drywall, then the drywallers took over. Holey cow, don't get in their way, they are like busy little beavers at work.
Then I found out about the drywallers aftermath. They are a messy bunch of people. Jeff and I spent 2 hours that night cleaning up the wake of destruction.
Day 61/62 (Sat/Sun) - Pam's Work
Sometimes you just have to make things right yourself. I spent part of this weekend framing things to get ready for drywall on Monday. I framed an access hole to get into the bathtub in case I ever need to work on it. Isn't that just the prettiest access hole you've ever seen. I spent most of Sunday admiring my handy work.

I also frame the old attic access hole so it could be drywalled over. I demo'ed the downstairs hallway trim the leads to the bedrooms. and added a few filler pieces in the old basement stair soffit area.
I also frame the old attic access hole so it could be drywalled over. I demo'ed the downstairs hallway trim the leads to the bedrooms. and added a few filler pieces in the old basement stair soffit area.
Day 59/60 (Thu/Fri) - Siding, fireplace
Sort of a quieter set of days, the guys were back siding. Here is a picture of the first side of the house just about done.
Wednesday, October 7, 2009
Day 57/58 (Tue/Wed) - Shower, Tub
Tue - It was raining today so apparently the carpenters wanted to work inside so they framed for the shower area and prepped for the tub area. The tub also arrived, it is in the garage now.

Wed - Back at some more little framing projects, the tub framing is done and so is the half wall for the toilet area.


Then they demo'ed the rest of the soffit in the kitchen/dining area. Now that was a messy project, I have dust everywhere in the house.
Wed - Back at some more little framing projects, the tub framing is done and so is the half wall for the toilet area.
Then they demo'ed the rest of the soffit in the kitchen/dining area. Now that was a messy project, I have dust everywhere in the house.
Monday, October 5, 2009
Day 56 (Mon 10/5) - Soffit, Facia, Siding
The carpentry crew arrived this morning and they started working on the soffit and facia on the exterior of the house. Can't wait for this to get finished, then at least the outside will look complete.
Day 55 (Sun) - TV/Stereo Cable Pipes
We decided to get going on adding the pipes to hold the stereo cables. We need to run cables between where the stereo will be and where the TV's will eventually be mounted. This ended up taking longer than expected, but what project doesn't around here. Finished this about 10pm.
Sitting room side

Master bedroom side
Sitting room side
Master bedroom side
Day 54 (Sat) - Granite
We went and picked out granite today. Drove to Mundelein and actually tried to stay within our budget for a change. We'll see what the price ends up being but here are the colors we picked. Then we drove to Itasca to pick out the slab for the vanities and the vendor was out of stock so we drove to the second location in Addison and pick out a slab there. The fireplace is a remnant so no slab selection was necessary.
The one on the left is the vanity granite.
This one is the fireplace, it is tough to get a good photo of this one. The granite is mostly black with a copper type of color showing thru rather faintly.
Day 53 (Fri) - Insulation
It was a big day today for warmth. The insulation was installed today. They did all the exterior walls. Then after they left I did some interior walls to soften the noise in the bathroom and laundry areas.

Then I took some of the blown insulation from what the guys had removed and filled up with bathroom floor with it. So nobody below should hear noise coming from the bathroom now plus the pipes should be nice and warm too.
Then I took some of the blown insulation from what the guys had removed and filled up with bathroom floor with it. So nobody below should hear noise coming from the bathroom now plus the pipes should be nice and warm too.
Thursday, October 1, 2009
Day 51 (9/30 Wed) - Rough Inspection Day
Today was a milestone day, we had rough inspection on plumbing, electrical, and framing. Each only made a few comments, nothing significant. The wanted the plans changed to show the placement of the furnace. They wanted to remind the carpenter of the stair length and wanted the fireblock caulk in place before the inspection. I guess the contractor is used to an insulation inspection and the caulk is usually part of that. Now the inspector has to return to look at caulk, go figure.
I did a lot of little projects. Added a few studs for mounting the TV's later. Helped configure the "old" attic access area. Put in some insulation along the outside walls under the floor as long as it was up. And of course did more staining/finishing of the trim in the garage. Getting close to being done with the trim, at least what they have brought me.
I did a lot of little projects. Added a few studs for mounting the TV's later. Helped configure the "old" attic access area. Put in some insulation along the outside walls under the floor as long as it was up. And of course did more staining/finishing of the trim in the garage. Getting close to being done with the trim, at least what they have brought me.
Day 49/50 (Mon/Tue) - Finishing up for rough inspection
Mon/Tue - The plumber brought extra help and got a lot done with the rough plumbing so he would be ready for inspection on Wed.
The carpenter came and roughed in the fireplace, then we realized we made an error and he had to redo part of it. Oops. This picture is before the redo.

The HVAC guy came and put the fireplace in it's framed spot.

The carpenter came and roughed in the fireplace, then we realized we made an error and he had to redo part of it. Oops. This picture is before the redo.
The HVAC guy came and put the fireplace in it's framed spot.
Days 43-48 (Tue/Sun) - Plumbing and Staining
Didn't post all week because it was just a week of me staining during my vacation week and the plumber putting in the rough plumbing.

Jeff thought it was funny watching me climb into one of the windows to stain it. Can't reach it with a ladder because it would sit on the stairs uneven so it is the only way to access the window that I can think of.
Jeff thought it was funny watching me climb into one of the windows to stain it. Can't reach it with a ladder because it would sit on the stairs uneven so it is the only way to access the window that I can think of.