The HVAC (furnace/AC) guys started today, only a partial day of work so they didn't get too far but lots of stuff arrived anyway.
The electrical guys were a partial day too so they just got the box mounted and the path from the basement to the upstairs routed with pipe.
We are starting to get first drafts on the drawings for the cabinets too. I have revised some drafts of the laundry and bathroom so far. Still need to see the fireplace and desk areas.
And I talked to the roofer again to discuss ridge vents vs power vents vs standard vents. More to discuss on that one when he is here next, if it ever stops raining.
No comments:
Post a Comment